Monday, 1 April 2013

Layout Update 1/4/2013

As this is my first update I will just inform you of how the layout is right now. Most of the track is down in the main station and point motors are installed. Isolated sections are wired. Main control panel is built with most parts working. This is the layout on the surface.

The next stage is to build the platform and the station ontop. The station will go between the track on the far left and the track on the right of it. The platform will extend all the way down to the end (where the backscene is placed)

 
 

Saturday, 30 March 2013

Dapol GWR Signals Video-Guide

This is my video guide to Dapol GWR motorised signals. 5 of these will be featured on the railway, 4 home signals and 1 distant. Here is a link to the video:
https://www.youtube.com/watch?v=1-wjLh793Mk

First Post

Hi to nobody who is reading this blog post!

Knapton Railway is my OO guage railway that I am building. I will be posting layout updates and maybe some 'how to' guides.

Hornbytrains125